Case Studies

Chorley Pavilion – New-build

  • Client

    Carefoot PLC
  • Location

    Chorley
  • Sector

    Hotels & Leisure
  • Requirements

    New-build installation
  • Objective

    To provide the complete mechanical design & installation at the new sports pavilion



Chorley Sports Pavilion is a new-build project for which we were asked to design and install the following:

  • All above ground drainage
  • Domestic water services
  • Sanitary ware & shower facilities
  • Mechanical ventilation to the building
  • Low temperature heating distributed to radiators & heat coils


First fix
As construction works progressed we first-fixed the shell with all pipework and ducting that would service the building.


Plant room
A complete fit-out of the plant room from the incoming water and gas supplies included gas safety interlocking, with energy efficient boiler and pumps.


Heating
Radiators sized to and located to provide efficient space heating throughout the building.


Toilets
Toilet facilities were installed and finished to our high standards.


Changing rooms and Showering
Changing room heating was achieved via below bench pipework which maximised useful wall space.
Showering facilities also included accessible options.

Results

It’s great for us to work on new-build installations and see the building develop over time into the finished project.
For the client:

  • A complete design & install service saving time and cost on the project
  • An energy-efficient installation
  • High standards maintained throughout our works
  • Hand-over of the project on-time and in-budget