Holiday Inn – Urgent Response
Client
Kew Green Hotels LtdLocation
Holiday Inn - RugbySector
Hotels & LeisureRequirements
Install temporary boiler plantObjective
Restore heating and hot water services to the hotel
This job started as an urgent call from the Holiday Inn Hotel in Rugby…
17th December (Thursday) We received a call to attend site and restore heat to the hotel.
1.4 megawatt of boiler plant at the hotel had been condemned by another contractor; the boilers had been isolated and 100 bedrooms left without heating or hot water.
18th December (Friday) The day our team would normally be enjoying an early finish and shutting down for Christmas!
They were mobilised and travelling down to site to make preparations to accept a 600kW temporary plant unit.
19th December (Saturday)