ibis Styles Hotel, Haydock lost its ground floor air conditioning and beer cellar cooling following an incident where a car left the road and crashed into an external compound which houses the outdoor units.
Initially, we received an early hours call to attend site and isolate the affected services to ensure all was safe; we would return later that day to assess the work required to replace the damaged equipment and get the hotels A/C and cooling services back on line.
|
Impact Damage
Following our initial visit to isolate the damaged equipment, we later attended site to assess and price the works required to reinstate the air conditioning and cooling services as soon as possible.
|
|
Blank Canvas
With the site cleared of damaged equipment and works to repair the perimeter fencing completed, we could approach this project as a new install and work to the standards and finish we are proud to deliver.
|
|
Back In Action
Getting a job done on-time and in budget is always our aim, and our engineers are people who can walk away from a job with pride in their work to deliver high standards in all they do.
This was another chance to showcase their abilities.
|